Q-2026-0315
SentGHD Pty Ltd
Engineering consultancy · Melbourne VIC · ABN 39 008 488 373
Dated Sat 12 Sep
Valid 30 days · to Mon 12 Oct
Ref GHD-RFQ-5590
Estimator: Grant Baxter
Schedule of rates
| Description | Qty | Unit | Line total |
|---|---|---|---|
| Mobilisation / demob — metro | 1 | $3,200.00 | $3,200.00 |
| Diamond coring HQ — 30–60 m | 300 | $420.00 | $126,000.00 |
| Auger / cased advance — per metre | 120 | $120.00 | $14,400.00 |
| Packer permeability test | 8 | $480.00 | $3,840.00 |
| Downhole geophysical logging (subcontract) | 6 | $1,950.00 | $11,700.00 |
| Subtotal (ex GST) | $159,140.00 | ||
| GST 10% | $15,914.00 | ||
| Total (inc GST) | $175,054.00 | ||
Notes: North East Link Stage 2. Rachel negotiating mobilisation timing.